<?xml version="1.0" encoding="UTF-8"?><rss xmlns:dc="http://purl.org/dc/elements/1.1/" xmlns:content="http://purl.org/rss/1.0/modules/content/" xmlns:atom="http://www.w3.org/2005/Atom" version="2.0"><channel><title><![CDATA[Mancose]]></title><description><![CDATA[Procetek]]></description><link>https://www.procetek.com/projects-insights</link><generator>RSS for Node</generator><lastBuildDate>Sat, 16 May 2026 23:56:10 GMT</lastBuildDate><atom:link href="https://www.procetek.com/blog-feed.xml" rel="self" type="application/rss+xml"/><item><title><![CDATA[Screw Compressor Replacement in EVA Unit (High-Load Operation)]]></title><description><![CDATA[Screw Compressor VM140 Replacement in EVA Unit (High-Load Operation)]]></description><link>https://www.procetek.com/post/screw-compressor-replacement-in-eva-unit-high-load-operation</link><guid isPermaLink="false">69fc524af4b0389e41d45796</guid><category><![CDATA[Compressor and Blower  Case]]></category><pubDate>Thu, 07 May 2026 09:14:37 GMT</pubDate><enclosure url="https://static.wixstatic.com/media/463cf3_a817fed52af14578ae9c2b20991f61a7~mv2.png/v1/fit/w_610,h_370,al_c,q_80/file.png" length="0" type="image/png"/><dc:creator>PROCETEK  </dc:creator></item><item><title><![CDATA[Metso Valve Replacement in High-Frequency PSA System]]></title><description><![CDATA[The client operates an air separation system with PSA technology requiring high-frequency valve operation.

The system originally used valves from Metso.]]></description><link>https://www.procetek.com/post/metso-valve-replacement-in-high-frequency-psa-system</link><guid isPermaLink="false">69e9c9eaa3f320e0758db1eb</guid><category><![CDATA[Case]]></category><pubDate>Thu, 23 Apr 2026 07:29:23 GMT</pubDate><enclosure url="https://static.wixstatic.com/media/46696d_8abc5e6bd3b74baa9a3cb14f511bc51f~mv2.jpg/v1/fit/w_779,h_1000,al_c,q_80/file.png" length="0" type="image/png"/><dc:creator>PROCETEK  </dc:creator></item><item><title><![CDATA[Bray Valve Replacement in Mine Water Treatment System]]></title><description><![CDATA[The client is a coal mining project involving mine water treatment systems.

The system originally used a 14” Class 600 LB butterfly valve from Bray, handling concentrated wastewater.]]></description><link>https://www.procetek.com/post/bray-valve-replacement-in-mine-water-treatment-system</link><guid isPermaLink="false">69e9c940c992063310d1770b</guid><category><![CDATA[Case]]></category><pubDate>Thu, 23 Apr 2026 07:26:33 GMT</pubDate><enclosure url="https://static.wixstatic.com/media/46696d_ff53a74494004ac6b99ad8cd1cd76bbd~mv2.jpg/v1/fit/w_825,h_1000,al_c,q_80/file.png" length="0" type="image/png"/><dc:creator>PROCETEK  </dc:creator></item><item><title><![CDATA[ADAMS Valve Replacement in District Heating System]]></title><description><![CDATA[The client is a power plant upgrade project in Inner Mongolia, involving a heating system expansion EPC project.

The system originally used a DN1400 PN25 electro-hydraulic fast-opening butterfly valve from ADAMS, operating at approximately 380°C.]]></description><link>https://www.procetek.com/post/adams-valve-replacement-in-district-heating-system</link><guid isPermaLink="false">69e9c7bfbbc0f3ff744808f6</guid><category><![CDATA[Case]]></category><pubDate>Thu, 23 Apr 2026 07:20:16 GMT</pubDate><enclosure url="https://static.wixstatic.com/media/46696d_513eaf6e86014a359a6fad549f49d2a9~mv2.jpg/v1/fit/w_452,h_760,al_c,q_80/file.png" length="0" type="image/png"/><dc:creator>PROCETEK  </dc:creator></item><item><title><![CDATA[Orton Valve Replacement in PDH Unit (560°C)]]></title><description><![CDATA[The client is a petrochemical company operating a propane dehydrogenation (PDH) unit for polypropylene production.

The system originally used a 42” Class 300 LB triple-offset butterfly valve from Orton, handling high-temperature media at approximately 560°C.]]></description><link>https://www.procetek.com/post/orton-valve-replacement-in-pdh-unit-560-c</link><guid isPermaLink="false">69e9c61bbbc0f3ff7448055b</guid><category><![CDATA[Case]]></category><pubDate>Thu, 23 Apr 2026 07:13:06 GMT</pubDate><enclosure url="https://static.wixstatic.com/media/46696d_aa297cfa6d154460a4f9a7abf5be873e~mv2.jpg/v1/fit/w_1000,h_846,al_c,q_80/file.png" length="0" type="image/png"/><dc:creator>PROCETEK  </dc:creator></item><item><title><![CDATA[OEM Replacement Case — High-Pressure Butterfly Valve Replacement in Power Plant Steam System]]></title><description><![CDATA[The client is a thermal power generation company operating high-pressure steam systems for continuous power production.

The system was originally equipped with a 10” Class 600 LB high-pressure pneumatic butterfly valve from KSB, used for controlling superheated steam at approximately 442°C.

After long-term operation under high-temperature and high-pressure conditions, the valve showed signs of aging, increasing maintenance cost, and declining reliability, leading the client to seek a more stab]]></description><link>https://www.procetek.com/post/oem-replacement-case-high-pressure-butterfly-valve-replacement-in-power-plant-steam-system</link><guid isPermaLink="false">69e9c543d06bed7d1aa021ee</guid><category><![CDATA[Case]]></category><pubDate>Thu, 23 Apr 2026 07:10:22 GMT</pubDate><enclosure url="https://static.wixstatic.com/media/46696d_bb0ca6a440534fc8b15f8707e7949603~mv2.jpg/v1/fit/w_1000,h_849,al_c,q_80/file.png" length="0" type="image/png"/><dc:creator>PROCETEK  </dc:creator></item><item><title><![CDATA[High-Pressure Valve Replacement in Power Plant (540°C / 1500 LB)]]></title><description><![CDATA[The client is a thermal power plant operating a superheated steam system at 540°C and Class 1500 LB pressure, originally equipped with KSB valves.]]></description><link>https://www.procetek.com/post/high-pressure-valve-replacement-in-power-plant-540-c-1500-lb</link><guid isPermaLink="false">69e703d18b2f11ff8e580aaf</guid><category><![CDATA[Case]]></category><pubDate>Tue, 21 Apr 2026 04:58:18 GMT</pubDate><enclosure url="https://static.wixstatic.com/media/46696d_a89630e1a49848388a73ae51923336b0~mv2.jpg/v1/fit/w_831,h_986,al_c,q_80/file.png" length="0" type="image/png"/><dc:creator>PROCETEK  </dc:creator></item><item><title><![CDATA[Vanessa Valve Replacement in PTA Chemical Process]]></title><description><![CDATA[The client operates a large-scale PTA (Purified Terephthalic Acid) production project involving corrosive media.

The system originally used a Vanessa valve in the acetic acid recovery tower.]]></description><link>https://www.procetek.com/post/vanessa-valve-replacement-in-pta-chemical-process</link><guid isPermaLink="false">69e6ffe8e30ec41b7d0706b2</guid><category><![CDATA[Case]]></category><pubDate>Tue, 21 Apr 2026 04:43:50 GMT</pubDate><enclosure url="https://static.wixstatic.com/media/46696d_e67f472111af4c92b6dcb244583cb211~mv2.jpg/v1/fit/w_794,h_596,al_c,q_80/file.png" length="0" type="image/png"/><dc:creator>PROCETEK  </dc:creator></item><item><title><![CDATA[Replace International Valve Brands — Proven OEM Replacement Cases]]></title><description><![CDATA[Many industrial systems rely on valves from established international brands.However, over time, operators often face challenges such as high maintenance cost, long spare parts lead time, and aging equipment.

Procetek provides high-compatibility replacement solutions based on a Form-Fit-Function approach, ensuring seamless integration with existing systems.

Our solutions are not only designed to replace original equipment, but also to improve reliability, reduce lifecycle cost, and enhance lon]]></description><link>https://www.procetek.com/post/replace-international-valve-brands-proven-oem-replacement-cases</link><guid isPermaLink="false">69e6fb7b8e63193b95d4c7e0</guid><category><![CDATA[Case]]></category><pubDate>Tue, 21 Apr 2026 04:23:43 GMT</pubDate><enclosure url="https://static.wixstatic.com/media/46696d_83460267ffdd4757a7112aad9fd491bc~mv2.png/v1/fit/w_1000,h_1000,al_c,q_80/file.png" length="0" type="image/png"/><dc:creator>PROCETEK  </dc:creator></item></channel></rss>