1. Project Overview
Industry: Petrochemical
Application: Polyester Production Unit
Original Equipment: VM45
Replacement Model: CS50H
Condition: 3.0 bar / Continuous Operation
Date: 2021
2. Project Background
The client operates a polyester production unit requiring stable compressed air supply under continuous operation.
The system originally used a VM45 screw compressor, which failed due to improper operation. With no standby unit available, the failure directly affected production continuity, requiring immediate replacement.
3. Challenges
Sudden equipment failure due to operational error
No backup compressor available
Production interruption risk
Urgent need for replacement within a short time
High cost and long lead time for original brand equipment
4. Our Solution
Procetek provided a CS50H oil-free screw compressor as a rapid replacement solution:
Fully matched original system parameters
Direct installation without system modification
Immediate availability for urgent delivery
Stable performance under continuous operation
5. Scope of Supply
· Oil-free screw compressor
· Procetek Model: CS50H
Equivalent / Reference Model Mapping
Original Model | Procetek Replacement |
VM45 | CS50H |
6. Performance Comparison
Parameter | Original (VM45) | Procetek (CS50H) |
Flow (m³/min) | 43.96 | 43.96 |
Pressure (bar g) | 3.0 | 3.0 |
Power (kW) | 184 | 184 |
Speed (rpm) | 9823 | 9823 |
7. Installation & Site Photos
Before Replacement


After Replacement
CS50H compressor installed on site
System restored to operation





Compared to the original unit, the replacement enabled rapid system recovery with stable performance and reduced procurement cost.
8. Results
Rapid system recovery with minimal downtime
Reduced procurement cost compared to original brand
Stable operation under continuous production
High compatibility with existing system
9. Why It Worked
Fast delivery capability
Accurate parameter matching
Form-Fit-Function compatibility
Reliable performance under production conditions
10. Conclusion
This project demonstrates Procetek’s ability to provide rapid-response replacement solutions in emergency situations, ensuring production continuity and reducing operational risk.
11. Call to Action
If you are facing urgent equipment failure or lack of standby systems,
👉 contact us for fast and reliable replacement solutions.



Comments