Screw Compressor Replacement in EVA Unit (High-Load Operation)
Screw Compressor VM140 Replacement in EVA Unit (High-Load Operation)
1
0
Apr 21, 2026 ∙ 1 min
High-Pressure Valve Replacement in Power Plant (540°C / 1500 LB)
The client is a thermal power plant operating a superheated steam system at 540°C and Class 1500 LB pressure, originally equipped with KSB valves.
4
0
Apr 21, 2026 ∙ 1 min
Vanessa Valve Replacement in PTA Chemical Process
The client operates a large-scale PTA (Purified Terephthalic Acid) production project involving corrosive media.
The system originally used a Vanessa valve in the acetic acid recovery tower.