D62S Blower Bearing Failure & Shaft Seizure Repair
1. Project Overview Industry: Industrial Equipment Service Equipment: D62S Blower Failure Type: Bearing Failure / Shaft Seizure Year: 2024 2. Project Background The D62S blower experienced sudden operational failure, with the main shaft unable to rotate. This caused a complete shutdown of the equipment. 3. Problem / Failure Analysis Shaft seized and unable to rotate Bearing damage System shutdown Risk of severe internal damage 4. Root Cause Investigation confirmed: Insufficient lubrication...

0
0
Jun 21, 20261 min
D24S Blower Pulley Deformation & Overhaul Repair
1. Project Overview Industry: Chemical Equipment: D24S Blower Failure Type: Pulley Groove Deformation / Routine Overhaul Year: 2023 2. Project Background The D24S blower was used in a chemical plant and required routine maintenance. During inspection, deformation in the pulley groove was identified, which could affect transmission stability. 3. Problem / Failure Analysis Pulley groove deformation Risk of belt misalignment Reduced transmission efficiency Potential for long-term mechanical...

0
0
Jun 21, 20262 min
GM50L Blower Abnormal Noise & Rotor Rubbing Repair
1. Project Overview Industry: Wastewater Treatment Equipment: GM50L Roots Blower Failure Type: Abnormal Noise / Rotor Rubbing Year: 2024 2. Project Background The client operates a wastewater treatment plant where stable blower performance is essential for aeration processes. During operation, the GM50L blower developed abnormal noise and vibration, indicating internal mechanical issues. 3. Problem / Failure Analysis Abnormal noise during operation Increased vibration level Evidence of rotor...